Planned Work

Feb 2008

  • Multi geochem programs starts.
  • First prep lab in place.
  • Historical metallurgical work begins.
  • A third security study to take place.

Mar 2008

  • Drill program begins.

Apr 2008

  • Aerial geophysics starts.

Apr - Jun 2008

  • Aerial geophysics starts.
  • More drills on site; Congolese with Chinese rigs and South African contractors on site.

Jul 2008

  • Second pep lab in place.

Dec 2008

  • Conceptual feasibility study starts.